cd /news/ai-infrastructure/google-s-revived-nuclear-power-plant… · home topics ai-infrastructure article
[ARTICLE · art-124393] src=hardware.slashdot.org ↗ pub= topic=ai-infrastructure verified=true sentiment=· neutral

Google's Revived Nuclear Power Plant Gets $1.9 Billion Loan From US Government

The U.S. Department of Energy approved a $1.9 billion loan to NextEra Energy to restart Iowa's shuttered Duane Arnold nuclear plant, which Google has backed to power its AI data centers. Deputy Secretary of Energy James Danly said the restart in 2029 will drive down electricity costs, while NextEra CEO John Ketchum noted that only 50 megawatts will be set aside for the local power cooperative, covering 18% of Iowa's demand growth since 2021.

by read1 min views2 publishedSep 9, 2026

The U.S. Department of Energy has approved a $1.9 billion loan to NextEra Energy to restart Iowa's shuttered Duane Arnold nuclear plant, which Google has backed as a power source for its growing AI infrastructure. "The sizable loan is the second of its kind, suggesting that the Trump administration views revived nuclear power as a key source of electricity for tech companies seeking to power their AI data centers," notes TechCrunch. From the report: James Danly, Deputy Secretary of Energy, said that the Iowa power plant's restart in 2029 will "drive down electricity costs," though he did not explain how. Just 50 megawatts will be set aside for the local power cooperative, NextEra CEO John Ketchum said during an earnings call (PDF) last year. That capacity would cover 18% of Iowa's demand growth since 2021, the year before ChatGPT was released.

Google is reportedly looking to build up to six data centers near the Duane Arnold Energy Center, which hasn't operated since 2020 when an intense rainstorm damaged the power plant. Rather than repair it, NextEra decided to mothball it. At the time, cheap natural gas was flooding the market, making nuclear power economically unappealing. A lot has changed in the last six years, though. After decades of little growth in demand, the sudden rise of AI coupled with broader electrification of the economy meant that utilities and power providers were suddenly scrambling to find new generating sources of electricity. New data centers are expected to nearly triple the sector's electricity demand by 2035. Read more of this story at Slashdot.

── more in #ai-infrastructure 4 stories · sorted by recency
── more on @u.s. department of energy 3 stories trending now
sponsored brought to you by zahid.host 4,200+ EU-deployed projects
reading about agents? ship yours in a single git push.

Run your AI side-project on zahid.host

EU-based hosting, git-push deploys, automatic HTTPS, no cold starts. Free tier with a custom domain — perfect for shipping the agent you just read about.

$git push zahid main
Live at https://your-agent.zahid.host
Get free account → Pricing
from €0/mo · no card required
LIVE [news/google-s-revived-nuc…] indexed:0 read:1min 2026-09-09 ·