# The six-week AI experiment: how to design a pilot that proves or kills a use case

> Source: <https://dev.to/azrty/the-six-week-ai-experiment-how-to-design-a-pilot-that-proves-or-kills-a-use-case-2bc5>
> Published: 2026-11-26 05:08:37+00:00

**Recommendation:** Before running an AI pilot, fix a falsifiable claim, measure the current process baseline, size the sample and set the kill criterion in advance so the result forces a go or no-go decision.
More in the playbook "Evals and testing for LLM apps": <https://wpnews.pro/playbooks/evals-testing>

Most AI pilots do not fail at the model. They fail at the question. A team spends six months, ships a demo that everyone agrees is promising, and then discovers that nobody can say whether it worked, because "worked" was never written down before the first prompt was run. The real cost is the decision: the use case gets neither a green light nor a red one, so it drifts into another pilot cycle. The fix is not a better model or a bigger budget. It is experiment design. Write a claim that can be falsified, measure the current process before any AI touches it, size the sample, set the kill criterion in advance, and agree with the business owner what "good enough for production" means before week 6. Six weeks is enough to do this properly for a single workflow. Here is the template, with a worked example in document processing and the numbers to copy.

McKinsey's state of AI in GCC countries survey found that 69% of organisations are still in pilot, which means roughly a third have reached the point where AI is scaled or fully deployed ([McKinsey and the GCC Board Directors Institute, The state of AI in GCC countries: In pursuit of scale and value, November 2025, PDF](https://gccbdi.org/sites/default/files/2025-11/The-state-of-AI-in-GCC-countries-In-pursuit-of-scale-and-value.pdf)).

MIT Sloan Management Review Middle East's enterprise AI readiness study gives a second read on the same picture: 46% of surveyed organisations reported moving beyond pilot to broader implementation, while 33% remained in early stages, focused on foundational capabilities ([MIT Sloan Management Review Middle East, Enterprise AI readiness in the Middle East](https://resource.mitsloanmelive.com/whitepapers/LP-H-VMC-Pure-Storage-FY-2025-Q3-1-email.html)).

Two surveys, two framings, one pattern: plenty of activity, thin evidence. Model access is not the constraint. Any team can call a frontier model's API this afternoon and get a useful answer. The constraint is that most pilots are designed so that no possible result counts as failure. When success was never written down before the first prompt, every outcome is arguable, and arguable outcomes drift into another pilot cycle instead of into a decision.

IBM's stage-gating framework for measuring AI outcomes puts the measurement plan before the money and the build. Step 4 is "determine your KPIs to gauge the success of the MVP", and it asks the questions most charters skip: is the sample size large enough for a statistically significant read, are the KPIs actually measurable, is there a mechanism to collect data in a way that isolates the impact of the AI, and how much data and how long do you need. Step 5 funds and executes the MVP. Step 6 gauges effectiveness against the KPIs that were fixed in advance ([IBM, 7-step stage gating framework for measuring AI outcomes](https://www.ibm.com/think/insights/measuring-ai-outcomes-7-step-stage-gating-framework)).

McKinsey reaches the same conclusion from the change-management side: adoption accelerates when teams frame use cases as testable predictions and run them with a control group, rather than treating them as rollouts to be celebrated (McKinsey, How organisations can overcome gen AI adoption challenges, July 2025). Read together, the two say the same thing: the experiment, not the model, is the unit of work.

Compare these two statements:

"Use AI to improve claims handling."

"An LLM extraction assistant that pre-fills the 12 intake fields from an inbound claim packet will cut median handling time from a measured 14.2 minutes to 10 minutes or less on at least 80% of eligible packets, while keeping packet-level first-pass accuracy at or above 78% and the exception rate at or below 11%, over a four-week window on at least 1,000 packets."

The first is a hope. The second can come out false. Use this sentence pattern and fill every bracket:

```
If [bounded capability] helps [named users] do [target job], then
[metric] moves from [measured baseline] to [threshold] on at least
[coverage]% of [unit of work], without [guardrail] exceeding [limit],
over [window] on a sample of n = [number].
```

Three tests a hypothesis must pass before you write a line of code:

Capture the current process before any AI touches it. Four things matter, measured on the same unit of work you will measure later:

If your systems record timestamps and status changes, pull 8 to 12 weeks of history and you have a baseline for free. If they do not, run two weeks of prospective capture with a sampling sheet before you build anything. The one thing you must not do is ask the team how long the work takes and write the answer down as the baseline. Recalled numbers drift, and they drift in the direction of the business case.

The second trap is the uncontrolled before-and-after comparison. IBM's write-up on measuring the ROI of AI-assisted development notes that before-and-after comparisons only hold with tightly matched time periods, stable teams and artefact-level data rather than self-reported estimates, and that comparing similar AI-enabled and non-enabled teams, or phasing the rollout, produces stronger evidence ([IBM, How IBM measured the ROI of AI-assisted development](https://www.ibm.com/think/insights/measuring-roi-ai-assisted-development-how-ibm-did-it)). Name the design you ran in the charter, and state its limits honestly in the readout.

**Sample size.** For a pass rate or accuracy proportion, the standard planning formula is Cochran's: n = z² p(1-p) / e², where z = 1.96 for 95% confidence, p is the expected rate and e is the margin of error in points. If you have no prior for p, use 0.5, which gives the largest requirement.

| Target | Assumed rate | Cases needed (95% confidence) | Use it for | 
|---|---|---|---|
| ±10 points | 0.50 | 97 | Smoke test. Catches large regressions only | 
| ±5 points | 0.50 | 385 | The default release gate | 
| ±5 points | 0.90 | 139 | When you already expect high accuracy | 
| ±2 points | 0.50 | 2,401 | A published benchmark number | 

Watch the unit of analysis. 385 extracted fields from 32 packets is not 385 independent observations if fields within a packet share a single OCR failure. Size the sample at the level where you will make the decision, usually the case, ticket or document.

**Window.** The window must contain the variation you care about. A two-week test that misses month-end, a payroll cycle or a Ramadan volume shift has measured a quiet fortnight, not the workflow. For back-office work, four weeks with a weekly guardrail check is a practical minimum.

**Counterfactual.** Every pilot must answer "compared to what". Pick the strongest design that is operationally feasible, and write down why you could not go stronger.

| Design | How it works | What it can support | Main limitation | 
|---|---|---|---|
| Concurrent randomised control | Cases assigned at random to assisted and current processes in the same period | Strongest within-pilot evidence of effect | Needs volume; groups contaminate each other through shared staff | 
| Staggered rollout | Teams start at different times; late starters act as comparison | Effect under real rollout conditions | Groups can differ for reasons unrelated to the AI | 
| Before and after | Same team measured before and after | Descriptive change only | Seasonality, staffing and case mix can explain the result | 
| Simpler alternative | A template, rule engine or better search tested alongside | Whether the AI beats a cheap fix | The alternative must be built well enough to be fair | 

That last row is underused and often decisive. If a deterministic template would have delivered 70% of the gain, the honest conclusion is "buy the template", not "the model works".

A kill criterion triggers on evidence, not sentiment. Agree three to five of them before launch, in two classes:

The teeth are in the pre-authorisation. Your charter states in advance that a triggered criterion forces a decision within five working days: either kill the experiment or file a written exception. Without that clause, a breached threshold becomes "something to watch", and the pilot rolls on to month seven.

Separately, define what good enough for production means. It is a higher bar than "beat the baseline":

A Dubai-based commercial insurer (illustrative, with realistic figures). Six claims clerks process about 3,200 inbound claim packets a month, roughly 150 per working day. Each packet is a PDF bundle: police report, repair invoice, medical bill, photographs. Twelve fields get keyed into the claims system.

**Week 1 to 2: baseline, no AI anywhere near the workflow.** Pulled from ticket timestamps and QA records:

| Metric | Measured baseline | 
|---|---|
| Median handling time per packet | 14.2 minutes (p90: 31 minutes) | 
| Packet-level first-pass accuracy (all 12 fields correct) | 78% | 
| Exception or rework rate | 11% | 
| Fully loaded cost per packet | AED 22.50 (6 clerks at AED 12,000 monthly loaded ÷ 3,200 packets) | 

**Hypothesis.** "An LLM extraction assistant that pre-fills the 12 intake fields from the packet will cut median handling time from 14.2 minutes to 10 minutes or less on at least 80% of eligible packets, while keeping packet-level first-pass accuracy at or above 78% and the exception rate at or below 11%, over a four-week window on at least 1,000 packets."

**Sample size.** Two questions, two calculations. For the time metric, a 4.2 minute reduction with a 6.5 minute standard deviation needs about 38 packets per arm at 5% significance and 80% power. For the accuracy metric, certifying a 78% rate within ±5 points at 95% confidence needs about 264 packets. The accuracy gate is the binding constraint, so allocate 500 packets per arm.

``` python
import math

def n_proportion(margin, p=0.5, z=1.96):
    """Cases needed to estimate a rate within `margin` points."""
    return math.ceil(z**2 * p * (1 - p) / margin**2)

def n_per_arm(sd, delta, z_a=1.96, z_b=0.8416):
    """Cases per arm for a two-sample comparison of means."""
    return math.ceil(2 * sd**2 * (z_a + z_b)**2 / delta** 2)

print(n_proportion(0.05))                  # 385  (worst case p = 0.5)
print(n_proportion(0.05, p=0.78))          # 264  (our accuracy gate)
print(n_per_arm(sd=6.5, delta=4.2))        # 38   (the time metric)
```

**Week 2 to 3: build and calibrate.** Extraction pipeline, an audit log of every field with the model version and prompt version that produced it, and a QA sampling sheet using the existing rubric. Week 3 runs 100 packets purely to calibrate prompts. Those 100 are training data for the prompt and must not enter the measurement sample.

**Week 4 to 6: measurement.** Every second packet ID is assigned at creation to the AI-assisted queue; the rest go to business as usual. Same reviewers, same rubric, weekly guardrail check. A charter that says what happens at week 4 is the difference between an experiment and a demo:

```
experiment:
  hypothesis: "Median handling time falls from 14.2 min to <= 10 min on >= 80% of packets"
  unit: claim_packet
  population: "All inbound commercial claims packets, 12-field intake"
  exclusions: "Litigated claims, multi-policy bundles"
  baseline_source: "Ticket timestamps + QA records, 8 weeks to 2026-01-31"
  sample: {control: 500, treatment: 500, window: "4 weeks"}
  counterfactual: concurrent_randomised
  thresholds:
    median_time_min: 10.0
    coverage_pct: 80
  guardrails:
    packet_accuracy_pct: 78   # must not fall below
    exception_rate_pct: 11    # must not rise above
  kill_criteria:
    - "Any PII sent outside the approved model endpoint: stop immediately"
    - "Packet accuracy < 74% for 2 consecutive weeks"
    - "Median handling time > 12.5 min at end of week 5"
    - "Coverage < 60% at week 5"
    - "Cost per packet > AED 22.50 at week 6"
  decision: {owner: "Head of Claims Operations", date: "end of week 6", sla_days: 5}
```

**Cost per outcome, honestly.** Assume 60,000 input tokens and 2,000 output tokens per packet at planning rates of USD 3 and USD 15 per million tokens. That is USD 0.21, about AED 0.77, of inference per packet. Your provider's current pricing page is the authority on rates; the point of the arithmetic is that inference is noise against AED 22.50 of labour. The experiment is decided by accuracy and time, not by token cost.

**The trap in the savings number.** A 30% time reduction is 4.2 minutes × 3,200 packets = 224 hours per month, which is 1.4 full-time equivalents. That is capacity, not cash. If the team stays at six clerks, nobody saves anything until the capacity is used or removed. The readout must name where the 1.4 FTEs go: more packets per month, fewer temporary staff at peak, faster settlement for customers, or a vacancy you do not backfill. This is the single most common reason AI ROI numbers are dismissed by finance.

Copy this into your charter. Every blank is a decision you make in week 1 rather than an argument you have in week 6.

| Field | What to write | Worked example value | 
|---|---|---|
| Hypothesis | One falsifiable sentence with mechanism and numbers | 14.2 to ≤10 min on ≥80% of packets | 
| Population and exclusions | What is in, what is out, and why | Commercial claims intake; litigated claims out | 
| Baseline metric and source | Measured, with the system it came from | Ticket timestamps, 8 weeks | 
| Primary threshold | The number that means "worked" | Median ≤10.0 minutes | 
| Coverage bar | Share of units the system must actually handle | ≥80% of eligible packets | 
| Guardrails | What must not degrade, with current values | Accuracy ≥78%, exceptions ≤11% | 
| Mandatory rules | Pass or fail, one strike | No PII outside approved endpoint | 
| Kill criteria | Numeric, verifiable, pre-authorised | Accuracy <74% for 2 weeks, etc. | 
| Counterfactual design | Which comparison you run and why | Concurrent randomised, packet level | 
| Sample and window | n per arm, dates, expected variation covered | 500 per arm, 4 weeks incl. month-end | 
| Good-enough-for-production | The bar above "better than baseline" | Thresholds met, audit log, owner for failures | 
| Cost per outcome | Inference + review + platform, per unit | AED 0.77 inference vs AED 22.50 labour | 
| Decision owner and date | Named person, calendar invite, 5-day SLA | Head of Claims Operations, week 6 | 

If you want a second opinion on a use case before you fund the build, that is exactly where our [AI strategy and readiness](https://www.azrty.com/services/ai-strategy) work starts: we look at how your business runs, from processes and systems to data, and tell you plainly where AI will pay off, what it takes and what to do first. When the experiment passes and you need the agents, applications and integrations built on your own infrastructure, that is [AI engineering](https://www.azrty.com/services/build). Azrty is based in Dubai, and our own team in the UAE does the consulting, the deployment and the support.