$1.3T Physical AI Market: Hitachi Targets Data Centre Power Limits With Grid-Linked Control Hitachi executives outlined plans to address power-grid and labor bottlenecks in a physical AI market Hitachi estimates will reach approximately $1.3 trillion by 2030 at a 9.5 percent compound annual growth rate, introducing the Integrated World Infrastructure Model, a foundation architecture combining physical and knowledge models across data centers, power grids and factories. In laboratory verification on GPU hardware, Hitachi's integrated thermal and computing control cut GPU speed-reduction time from about 10 minutes to roughly 30 seconds and raised AI processing volume per unit of power by 20 percent. Commercial pricing, licensing terms and performance under live regional grid failures remain undisclosed. East Asian Technology Intelligence Tech news from Japan, China, Korea & Taiwan — translated, contextualized, and delivered for Western readers. Free. Unsubscribe anytime. This story ran in Issue 166 https://asiaai.fyi/east-asia-ai-chip-news-2026-11-24/ , alongside three other stories. Robotics & Automation What happened Hitachi https://asiaai.fyi/companies/hitachi/ executives outlined strategies to overcome severe resource bottlenecks—such as power grid limits and labor shortages—that threaten the projected 1.3 trillion dollar physical AI market by 2030. The company introduced its Integrated World Infrastructure Model , an intelligence foundation architecture that coordinates physical and knowledge models across data centers, power grids, and factories. Demonstrations included closed-loop power control between data centers and power systems to reduce GPU performance throttling and prevent transmission overloads. Key details - Hitachi estimates the social infrastructure physical AI market will reach approximately 1.3 trillion dollars by 2030 with a compound annual growth rate of 9.5 percent. - Hitachi introduced the Integrated World Infrastructure Model in November 2025 as a foundation model architecture combining physical models and knowledge models. - Laboratory verification using GPU hardware showed that integrated thermal and computing control reduced GPU speed reduction time from about 10 minutes to roughly 30 seconds while increasing AI processing volume per unit of power by 20 percent. What remains unclear - Commercial pricing structure and licensing terms for the Integrated World Infrastructure Model - Performance metrics of the watt-bit coordination system under live regional grid failure conditions - Specific hardware vendor dependencies for the thermal and computing control systems Source: ITmedia AI+ · source published November 23, 2026 Industrial giants in Japan are positioning AI as an operational infrastructure layer rather than a standalone software service, aligning software agents directly with heavy electrical and manufacturing assets. For the wider picture, see Japan Robotics Landscape https://asiaai.fyi/guides/robotics-in-japan/ . For the numbers behind Japan’s industrial and physical AI push, see industrial AI in Japan https://asiaai.fyi/guides/japan-ai-industry-map/ industrial-ai-in-japan in our Japan AI Industry Map. Original source Japanese 眠る「200兆円市場」、フィジカルAIを阻む「資源不足」 日立は独自技術で突破口探る Published November 23, 2026 This story appeared in AsiaAI.FYI Issue 166 https://asiaai.fyi/east-asia-ai-chip-news-2026-11-24/ . Get AsiaAI.FYI in your inbox — subscribe free https://asiaaifyi.beehiiv.com/subscribe .